Construction and Maintenance of Water Distribution Pipelines
Previous
Next
Scope of work:
1.Installation, Testing & Commissioning of HDPE lines 2.Interconnection with existing lines 3.Emergency line repair works. (HDPE, GRP & DI pipelines) 4.Construction of chambers, thrust blocks, Directional drilling, etc.
Location: Umm Al Quwain, Ajman, Dibba, Fujairah, Ras Al Khaimah, and Dhabid
Completed:
Total Pipeline Layed in UAE of various sizes from DN 100 to 1800 Dhaid : 733 Kilometers Ras Al Khaimah: 362 Kilometers Dibba : 231 Kilometers Umm Al Quain: 132 Kilometers Ajman: 130 Kilometers Total Pipe Layed in UAE: 1583 Kilometers
Construction of Pumping Station
Previous
Next
Scope of work:
1. Civil Work Construction of Pump Room 2. Pumps and motors up to – 200KW 3. Installation, testing & commissioning of the Pump room 4. Lamination and DI piping work inside the pump 5. Installation of Control Valve and Fittings for Pipeline 6.Supply and installation of the electrical connection for the Pump Room
Location: Dibba
Repair, Replacement & Maintenance of Water Tanks
Previous
Next
Scope of work:
1.Grit blasting & protective coating of Tank & towers 2.Repair/replacement of Tanks 3.Repair/replacement of pipelines 4.Tank cleaning, Valve changing, Level indicator / Level transmitter, repair, etc.
Location: Northern Emirates
160 MM X 1 WAY Direction Drilling HDPE Pipe Crossing
Previous
Next
Scope of work:
1. Surveying and Preparation of drawings 2. Monitoring of 160 mm Transco and 600 mm dolphine line 3. Trial pit to check existing utilities and for entry and exit pit 4. Directional drilling around RM 38 around rocky soil carefully with the locator
Location: Showkha
Design, Supply & Construction of Plant Internal Road
Previous
Next
Scope of work:
1. Plant internal road, footpath & car parking. Approx.: 16KM 2. Supply, install, testing & commission control cables. – 20KM 3. Supply and installation of UPVC duct lines. – 10KM 4. Road Markings, Traffic Sign Boards, etc. 5. GRP Water lines – 2KM, fire hydrant lines, protection barriers, etc.
Location: Ajman Power Plant
Construction and Maintenance Work
Previous
Next
Scope of work:
1. 600 mm dia ac piping for (underground cable ducting), coal hopper, conveyor tunnel, transformer building, silo 2. Reclaimer, kiln, cooler, ducts, preheater, cement mill, conveyors – maintenance works 3. Brick lining, cladding, silo cleaning, equipment erection, structural steel & wear-resistant steel works 4. Construction of raw water tank, product water tank, cooling water tank, pump house, transformer building & control room 5. Complete construction of pump house, raw water tank, cooling water tank, potable water tank, bore well pumps and piping and 5.5 km 200 dia ac pipeline, valve chamber, pump connection control building, etc.
Location: Cement Plant in Fujairah
Construction of Chemical Lab
Previous
Next
Scope of work:
1. Chemical resistance tile fixing in central laboratory 2. Gas piping working in central laboratory 3. Fabric partition 4. Hvac – ac ducting system
Location: Ajman
Aluminum Work
Previous
Next
Desalination Plant
Previous
Next
Location: Ajman
Construction and Maintenance of Water Distribution Pipelines in Umm Al Quwain, Ajman, Dibba, Fujairah, Ras Al Khaimah, and Dhaid
Scope of work:
1.Installation, Testing & Commissioning of HDPE lines 2.Interconnection with existing lines 3.Emergency line repair works. (HDPE, GRP & DI pipelines) 4.Construction of chambers, thrust blocks, Directional drilling, etc.
Completed:
Total Pipeline Layed in UAE of various sizes from DN 100 to 1800 Dhaid : 733 Kilometers Ras Al Khaimah: 362 Kilometers Dibba : 231 Kilometers Umm Al Quain: 132 Kilometers Ajman: 130 Kilometers Total Pipe Layed in UAE: 1583 Kilometers
Construction of Pumping Station in Dibba
Scope of work:
1.Civil Work Construction of Pump Room 2.Pumps and motors up to – 200KW 3.Installation, testing & commissioning of the Pumproom 4.Lamination and DI piping work inside the pump house
5.Installation of Control Valve and Fittings for Pipeline
6.Supply and installation of the electrical connection for the Pump Room
Repair, Replacement & Maintenance of Water Tanks in the Northern Emirates
Scope of work:
1.Grit blasting & protective coating of Tank & towers 2.Repair/replacement of Tanks 3.Repair/replacement of pipelines 4.Tank cleaning, Valve changing, Level indicator / Level transmitter, repair, etc.
160 MM X 1 WAY Direction Drilling HDPE Pipe Crossing in Showkha
Scope of work:
1. Surveying and Preparation of drawings 2. Monitoring of 160 mm Transco and 600 mm dolphine line 3. Trial pit to check existing utilities and for entry and exit pit 4. Directional drilling around RM 38 around rocky soil carefully with the locator
Design, Supply & Construction of Plant Internal Road in Ajman Power Plant
Scope of work:
1. Plant internal road, footpath & car parking. Approx.: 16KM 2. Supply, install, testing & commission control cables. – 20KM 3. Supply and installation of UPVC duct lines. – 10KM 4. Road Markings, Traffic Sign Boards, etc.
5.GRP Water lines – 2KM, fire hydrant lines, protection barriers, etc.
Construction and Maintenance Work in a Cement Plant in Fujairah
Scope of work:
a. 600 mm dia ac piping for (underground cable ducting), coal hopper, conveyor tunnel, transformer building, silo b. Reclaimer, kiln, cooler, ducts, preheater, cement mill, conveyors – maintenance works c. Brick lining, cladding, silo cleaning, equipment erection, structural steel & wear-resistant steel works d. Construction of raw water tank, product water tank, cooling water tank, pump house, transformer building & control room
e. Complete construction of pump house, raw water tank, cooling water tank, potable water tank, bore well pumps and piping and 5.5 km 200 dia ac pipeline, valve chamber, pump connection control building, etc
Previous
Next
Construction of Chemical Lab in Ajman
Scope of work:
1. Chemical resistance tile fixing in central laboratory 2. Gas piping working in central laboratory 3. Fabric partition 4. Hvac – ac ducting system